Tri-River Ventures Inc. Tri-River Ventures Inc.

Related Information:

Location

Geology

Project History

Development Program

Exploration Potential

Photo Gallery

Technical Reports

Resources

The Lianlong Property - Project History


IDENTIFIER
LENGTH (m)
NOTE
Drilling
DDH ZK3031
130
 
Phase 1 Drilling
DDH ZK403
220
 
Phase 1 Drilling
DDH ZK801
250
 
Phase 1 Drilling
DDH ZK802
190
 
Phase 1 Drilling
DDH ZK803
110
 
 
Total Phase 1 Drill
900
 
Phase 1 U/G
YM001
240
Drifting along structure
Phase 1 U/G
CM001
145
Crosscut
Phase 1 U/G
CM401
40
Crosscut
Phase 1 U/G
CM801
50
Crosscut
 
Total Phase 1 U/G
435
 



Plan map of proposed exploration program

Phase I Exploration Program

1. A program of property scale mapping, sampling and prospecting should be done, concentrating on the possibility of strike extensions of known mineral occurrences.


2. The recommended work requires a detailed topographic base, which must be made. This could be done with modern satellite techniques but the location is well suited for an instrument survey, which is the recommended course of action.


3. Detailed trenching, sampling and mapping of the four known mineralized zones have been recommended to provide more assay data and structural data. Trenching at approximately 25 m intervals should provide the details necessary. All work must be correctly surveyed.


4. A drilling program and the driving of an exploration adit would follow the above work. The author of the Technical Report envisions a program consisting of a series of angle holes to depths of up to at least 250 m would be required for a total of 900 m of diamond drilling. The quality of the rock being excellent, the drilling need not be of large diameter.


5. A total of 435 m of underground work, the continuation of an 85 m exploration cross-cut already completed, should be done to explore zone 1.


Phase II Exploration Program (contingent on Phase 1 results)
Contingent upon the results of the above work a further 2,250 m of drilling and about 940 m of underground work would be recommended.

Company News

Sep 16, 2016

Disposition of Lianlong Property in China; Moving to NEX

Mar 24, 2016

Disposition of mineral property

Feb 07, 2013

Change To Board Of Directors

For further information call:
Y.B. Ian He
Phone Number:604.306.5867
E-mail: he1987@yahoo.com
Michael Woods
Phone Number: 604-925-0551
E-mail: woodsco@shaw.ca
Disclaimer: